Traffic Calming and Safety Improvements at Trail Crossings- City of Napa ST21PW06
The work generally consists of the installation of concrete sidewalk panel replacement/grinding, five (5) new curb ramps and two (2) new Rectangular Rapid-Flashing Beacon (RRFBs) along Pueblo Avenue. Installation of ten (10) new Rectangular Rapid-Flashing Beacon (RRFBs) along the bike path stretching from California Avenue to Vallejo Street.
Plans
(click to expand/collapse)
Name | Size | ||
ST21PW06_Plans-SIGNED | 5.0 MB |